A status update that makes the next decision clear
QUICK REFERENCE
A useful status update tells someone what changed, what is still uncertain and what you need from them. Keep activity separate from results. “Worked on the draft” describes effort; “the draft is ready for review, with one section awaiting figures” describes a state someone can act on.

When to use this
Use this for a project check-in, a weekly team note or a client progress message when a long list of tasks is hiding the important change.
Know these three terms
Completed
Work finished to the agreed check, rather than work merely started.
Blocked
Work that cannot proceed until a particular input or decision arrives.
At risk
An expected outcome that may change; it is not automatically a missed commitment.
A practical way to do it
Lead with the change
Compare the current state with the previous update. Name the result, not every action taken. If nothing material changed, say that briefly and explain the next checkpoint rather than manufacturing progress.
Separate a risk from a blocker
A risk might affect the plan; a blocker is already preventing a step. Describe the specific dependency and its effect. Avoid assigning blame or treating your proposed solution as someone else’s agreed action.
Make the request answerable
Ask for a specific decision, input or confirmation. State a date only if it is a real requirement or an explicitly proposed date. Keep the proposed date labelled until the responsible person agrees.
At a glance
| State | Example wording | Next useful detail |
|---|---|---|
| Ready for review | The outline is complete. | Who needs to review it? |
| Waiting | The figures have not arrived. | Which section depends on them? |
| Decision needed | Choose the short or full version. | What trade-off should the reader consider? |
A small example
Fictional example: a volunteer event guide has a finished outline and two unconfirmed transport details. The update says the outline can be reviewed now, identifies the two gaps and asks the organiser who will confirm them. It does not say the guide is finished or invent an arrival date.
Copy this working template
Use the fields directly in your own notes. AI is optional; check any AI-prepared version against your facts.
Since the last update:
Ready or completed:
In progress:
Waiting on / at risk:
Effect on the current plan:
Decision or input needed:
Next confirmed checkpoint:
Check before moving on
- Completion claims match the actual review state.
- The reader can find the main change in the first paragraph.
- Each request has a clear decision or input.
- Dates and commitments are supported by the working record.
Common questions
Should I use red, amber and green labels?
Only if your team shares the same meaning for them. Add the actual condition and next action. A colour without an explanation can hide more than it communicates.
What if the update is bad news?
State the known problem, its current effect and the decision needed. Distinguish what you know from what you are still checking. Avoid a reassuring date you cannot support.